Latest News


ISWA World Congress 2007

ISWA

Increased WtE plant efficiency by High-Level Control can optimize the operation with typical 3-5% higher efficiency in steam production.

Dublix Engineering A/S has been invited to present a paper at the ISWA World Congress 2007. The event takes place 24-27 September 2007 in Amsterdam, the subject is high level control; please refer to the programm of the conference. (www.ISWA2007.org)

Dublix enters the Italian WtE market

First Optimization order in Italy

An important step forward has been taken into the Italian Waste to Energy market Dublix Engineering A/S has entered an important contract at the Waste to Energy plant in Sesto san Giovanni located outside Milan.

AVR, Rotterdam one of the largest WtE plants in Europe intall FuzEvent

AVR Afvalverwerkung B.V. a large plant operator in Holland has decided to install an optimization system based on the FuzEvent high level control system on one combustion line at one of the largest waste to energy plants in Europe. The plant located in Rozenburg outside Rotterdam is operating 7 combustion lines.

Dublix Engineering A/S Established

The two companies; Parvang Holding ApS and Dublix Consulting ApS joins effort and establish Dublix Engineering A/S in order extend the capacity and to use the synergy towards the Waste to Energy and Biomass market. The core field of services and projects are plant efficiency and optimization based on mechanical know-how, process expertise and expert systems.

Syndicate content