Core, Sesto San Giovanni
Core, Sesto San Giovanni is an Italian Waste-to-Energy plant, built in 2001, burning household waste on three line of a 3.2 ton/hour capacity each and equipped with de Bartolomeis air-cooled grates.
Dublix Engineering provided:
- Project management (2001-2005)
- Commissioning and Start-up services
- Operation Management Contract (2001-2005)
- Supply of grate parts (through Thepa ApS)
- Online explosion cleaning (through Thepa ApS)
The FuzEvent Installation
The FuzEvent project is in commissioning from September 2008.
Dublix Engineering expects to complete the project in October 2008 and to achieve a 30% more stable steam production.