I/S REFA is a Danish waste incinerator in Nykøbing, two major supplies from Dublix Engineering has been completed.

The air-cooled grate line no. 3 of 9 t/day was commissioned in 2001.

Dublix Engineering provided during the errection and commissioning of this plant:

  • Project completion management
  • Guarantee period management

Refa
I/S Refa located in the city of Nykøbing Falster in the south of Denmark
 
The Supply of the new SAR 3 were made from Dublix in 2010 and 2011

  • The supply included SAR 3 grate supply for two combustion lines
  • The plant carried out the installation of the new grate
  • Very positive operational effect were obtained 
  • Please look at a small movie made by I/S Refa