5-10 % more efficency at Waste-to-Energy and Biomass
Click on the problem you encounter at your plant to view the common origin for this problem, and Dublix Engineering’s solution to it.
Plant Operation:
- Low efficiency: you want your plant to produce more steam/electricity
- Plant shutdowns too frequent, too long and/or unplanned shutdown
- Equipment bottlenecks caused by the size of the fans/boiler/flue gas cleaning etc.
Furnace Operation:
- Unstable operation, typically visible in the steam production fluctuation and/or variation of temperature in the combustion chamber
- Too much need for operator intervention on the control
- Low capacity: you want to burn more waste
- Important variations in the type of waste (e.g variation in calorific value), making the current combustion control system inefficient
Additional problems and solutions especially for Volund grates:
- Upgrade of the grate to state of the art design
- Too much riddlings falling in the collecting hoppers, forcing frequent cleaning
- Frequent sole plate cracks, needing repairs during planned stops
Boiler Operation:
- Inefficient boiler operation
- Too high fluegas temperature into the boiler
- Too high fluegas temperature before the convection parts
- Too high fluegas temperature out of the boiler, forcing a reduction in incineration capacity
- High CO or NOx emissions
If the problem you are facing at your plant is not listed there, contact Dublix Engineering and we can invent a new solution to your specific problem.

Contact Information
Dublix Engineering A/S
Grusbakken 10
DK-2820 Gentofte
Denmark
CVR No. DK 30 19 87 43
Tel: +45 45 65 05 40
Fax: +45 45 65 05 41
E-mail: info [at] dublix [dot] com
Jobs
Dublix has open job opportunities.
Dublix Engineering A/S newsletter
Stay informed on our latest news! Sign-up for the Dublix Engineering Newsletter: