Fixing Equipment Bottlenecks
The plant might be facing various equipment bottlenecks that are constraining the operation of the plant, such as:
The primary or secondary or cooling air fan is too small, resulting in a reduced capacity of the plant. This problem can be solved either by installing a new fan or, if possible, by installing another impeller in the fan for higher pressure and/or yield.
The boiler is too small, resulting in a too high fluegas temperature at the boiler outlet. This problem is worsening as the boiler becomes dirtier with residues sticking to its surface. A cleaner boiler therefore shall reduce the problem and Dublix Engineering can install the DD-Jet boiler cleaning system for online and frequent cleaning (1-2 times per week) of the boiler passes.
Contact Information
Dublix Engineering A/S
Grusbakken 10
DK-2820 Gentofte
Denmark
CVR No. DK 30 19 87 43
Tel: +45 45 65 05 40
Fax: +45 45 65 05 41
E-mail: info [at] dublix [dot] com
Jobs
Dublix has open job opportunities.
Latest News
Dublix Engineering A/S newsletter
Stay informed on our latest news! Sign-up for the Dublix Engineering Newsletter:
