Increasing Capacity

All along the combustion process, some adjustments and upgrades can be made to maximize the amount of waste treated, and as a result, generate a higher profit.

A lower capacity in the plant is often caused by:

  • Mechanical wear on some parts of the furnace
  • Most operators find it very demanding and troublesome to handle the complexities of constantly obtaining optimal operation efficiency

Dublix Engineering can solve those issues with the following services/products:

Typical the plant optimized by Dublix Engineering achieves a 3-10% increase in plant capacity.