Increasing Capacity
All along the combustion process, some adjustments and upgrades can be made to maximize the amount of waste treated, and as a result, generate a higher profit.
A lower capacity in the plant is often caused by:
- Mechanical wear on some parts of the furnace
- Most operators find it very demanding and troublesome to handle the complexities of constantly obtaining optimal operation efficiency
Dublix Engineering can solve those issues with the following services/products:
- Optimization of the grate surfaces porosity to the waste at hand
- Various combustion system upgrades and repairs
- The FuzEvent High-Level control system
Typical the plant optimized by Dublix Engineering achieves a 3-10% increase in plant capacity.
Contact Information
Dublix Engineering A/S
Grusbakken 10
DK-2820 Gentofte
Denmark
CVR No. DK 30 19 87 43
Tel: +45 45 65 05 40
Fax: +45 45 65 05 41
E-mail: info [at] dublix [dot] com
Jobs
Dublix has open job opportunities.
Dublix Engineering A/S newsletter
Stay informed on our latest news! Sign-up for the Dublix Engineering Newsletter:
