Fewer Plant Shutdowns
Plant shutdowns for cleaning and repair of the equipment should be swift and unplanned stops limited: for each hour that the plant is not burning waste, it is not generating profit.
Long/frequent plant shutdowns are often caused by:
- Repairs of equipment in the furnace, like cracked sole plates
- Cleaning of the equipment, especially the boiler
- Inefficient control system of the plant
Dublix Engineering offers the following products/services to fix this problem:
- Fixing and upgrade of the sole plates to prevent future apparitions of cracks
- DD-Jet system for on-line boiler cleaning, during plant operation (even at full capacity)
- FuzEvent control system for better operation control and specifically programmed to reduce the wear on the plant and to avoid plant stops
Contact Information
Dublix Engineering A/S
Grusbakken 10
DK-2820 Gentofte
Denmark
CVR No. DK 30 19 87 43
Tel: +45 45 65 05 40
Fax: +45 45 65 05 41
E-mail: info [at] dublix [dot] com
Jobs
Dublix has open job opportunities.
Dublix Engineering A/S newsletter
Stay informed on our latest news! Sign-up for the Dublix Engineering Newsletter:
