Reference List

The DD-Jet Cleaning System has already been installed in 16 Waste-To-Energy plants in Europe. The latest ones were installed by Dublix Engineering AS in:

Installation of 4 nozzle head injection holes in order to clean the boiler at a rate of 15 minutes twice a week.

Fluegas temperature at the economizer was very sucesfully reduced by 120°C, which allows the plants to burn considerable more waste.

The Hallingdal project was commissioned during 3 days and completed, August, 2008.

Two DD-Jet systems covering all 3 combustion lines at this plant was sucesfully commissioned during 3 days and completed, September 2008.

The IVM Eeklo plant has successfully installed in March 2009 a DD-Jet Nozzle Head on their existent boiler cleaning system from another supplier that they had stopped using. The DD-Jet Nozzle Head is now operating on the plant's 2 lines.

  • IVAGO; Belgium, Waste to Energy Plant

One DD-Jet nozzle head installed in June 2009 on an existent boiler cleaning system.

  • Wijster, Essent Milieu; Nederland, Waste to Energy Plant

One DD-Jet nozzle head sucessfully tested 2009 on an existent boiler cleaning system.