The Priority Management System
The priority system of FuzEvent makes it possible to link the defined control elements into a priority network. The idea is to build a control strategy, which is composed of a number of individual control components (called EventX´s) that automatically are activated when a special process situations for this eventX is detected. If control components or EventXs are in conflict, it is possible by using the priority system to specify which control components are more important that other components. In this way the design of control with FuzEvent apply the same method as the experienced operator use.
Feed