Hsinchu, 2*19 ton waste/h

The Taiwanese waste incinerator in Hsinchu was commissioned in 1999 2 lines each with air-cooled grates of a capacity of 19 t/h.

Dublix Engineering provided:

  • Project management
  • Performance test
  • Guarantee period management

Hsinchu.jpg