Waste-to-Energy

2017, United Kingdom
Dublix Engineering received February 2017 a contract to upgrade the combustion control at the LondonWaste Energy Recovery Facility also named EcoPark located in Edmonton north of London City, UK. LondonWaste process around 400.000 ton of municipal and industrial waste annually on five combustion lines.
2017, Italy
AISA IMPIANTI Arezzo A.I.S.A. SPA is located in the city of San Zeno close to the historical city of Arezzo 260 km north of the city of Rome in Italy. The plant operates one combustion line with an annual combustion capacity of 38,000 tons of waste. Dublix has delivered service and equipment since 2010 including:
2015, United Kingdom
Viridor one of UK´s large ERF/WtE plant operators and waste treatment companies has during many years been operating the Bolton ERF plant. 
2014, France
The Vert le Grand WtE Plant optimized with FuzEvent Software on two WtE combustion lines, the plant is operated by Semardel, located 40 km south of Paris, France.
2013, Belgium
The ISVAG plant is located near Antwerp in Belgium, its two combustion lines are based on the Seghers grate technology from 1999 and 2001, the plant produces 400 degC/40 bar steam and are burning 9 ton waste/hour on each line.
2013, Belgium
Achieved: 5 % increase in plant capacity equal to 4.000 ton more treated waste per year, 98 % automatic combustion control on FuzEvent
2013, France
The Labeuvrière plant operates 3 combustion lines, Dublix  has supplied services to line 3.
2013, Belgium
Achieved: 35 % more stable steam production, 4 % increased steam production and 95 % fully automatic control by FuzEvent
2012, China
First FuzEvent in China on a Fisia Babcock Steinmüller grate, achieved > 30 % increased steam flow stability.
2011, Denmark
One WtE combustion line and flue gas cleaning system equipped with FuzEvent 2006.
2011, United Kingdom
Renewal of complete grate carpet with new DUB 3 design. Two combustion lines equipped with FuzEvent.
2011, Spain
Upgrade of combustion system with two Martin grates and obtained capacity to treat waste with 20 % increased heating value.
2009, Belgium
FuzEvent operating two combustion lines, more than 5000 ton/year increased waste treatment capacity. 100 % operator acceptance of high level control.
2009, France
>16 % increased waste capacity with , >10 % increased steam production. All three lines provided with FuzEvent in January 2009. Three DD-Jet nozzle heads installed.
2008, Netherlands
AVR Van Gansewinkel Groep is a Dutch Waste-to-Energy plant, built in 1972, burning household waste on 7 lines each of a 25 ton/hour capacity, equipped with Babcocks Roller grates.
2008, Norway
Successful use of DD-Jet System, flue gas temperature reduction 120°C 10 % more waste treatment capacity by FuzEvent
2008, Belgium
Automatic control (line 2) more than 90 % of the time, of all connected set-points. One DD-Jet system installed.
2004, Sweden
30% more stable combustion, reduction in CO emission levels, full operator accept.

Cement

2008, France
Holcim, Altkirch is a French cement plant, with one cement mill. The FuzEvent InstallationThe FuzEvent system was commissioned 2008.FuzEvent will increase the production control, the cement quality control and the cement quality/change over. Performance requirements:
2004, Sweden
Dublix Delivered FuzEvent high level control for optimized control of a raw mill material mixing system.
2003, Netherlands
2003, Netherlands
2002, United States
2002, Netherlands